Factory / Warehouse - PRIF0016



![]() |
Property - Overview
Total Building Area
2,016 ㎡Approximate size. Factory / Warehouse Area : 1,944 ㎡
Office Area : 72 ㎡ Other Area : 90 ㎡ Building Type : Detach Land Area
4.95 Rai (7,920 ㎡)
Zone Type General Zone
|
Price
87,000,000 Baht(Approx. 2,610,000 USD) Approximate price. Available Date SOLD OUTWaiting for construction about 8 months.
|
• 1Baht = About 0.030 USD, 1USD = About 33.57 Baht (Refer to Bangkok Bank currency transfer rate on 11 Apr 2025)
• More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
![]() New Construction |
![]() |
![]() |
![]() Good Access |
![]() Many Interest |
Last Update || 10 May 2021
4K Drone Gallery
Location
Province
Samutprakarn
City Zoning
Orange (Medium Density Residence)
Common Fee
Factory / Warehouse
General Zone : None
Land
General Zone : None
Sale Condition
Tax & Fee
Transfer Fee (2%) : No
Special Business Tax (3.3%) : No
Withholding Tax (1%) : No
Special Business Tax (3.3%) : No
Withholding Tax (1%) : No
Infrastructure

Floor Loading
Max. Loading : 3 Ton(s) / sq.m.
Clearing Height
Min. Height : 8 m., Max. Height : 10 m.
Electricity
Only electric system and lighting for basic usage. Don't have electric system, transformer, MDB for industrial usage. Require installation if needed.
Water Supply
Only water supply for basic usage. Don't have water system for factory equipments. Require plumbing work and pump installation if needed.
Interior Decoration
Don't have. (Require construction)
Telephone System
Don't have wiring, PBX, telephone. Require installation if needed.
Internet System
Don't have. Require contract ISP (internet service provider) and installation if needed.
Air Condition System
Factory : Don't have. (Self install, if need)Office : Don't have. (Self install, if need)
Facilities

Security
● Guard House● CCTV

Parking
● Space for about car(s) inside land of factory