THAI-KOUJYO.COM
Thailand, Industrial Estate, database, For Sale, Rent, Factory, Warehouse, Land

Factory / Warehouse - OSD1F0181

Property - Overview

Total Building Area
730 ㎡
Factory / Warehouse Area : 730 ㎡
Building Type : Detach
Zone Type
General Zone
Rental
180,000 Baht / Month
(Approx. 5,400 USD / Month)
Price per ㎡ : 247 Baht / ㎡ / Month
(Approx. 7 USD / ㎡ / Month)
• May have monthly expenses more than just monthly rent. See information below or ask before make any decision.
Available Date
Jan 2027
※ 1 バーツ (Baht)=約4.84円、1円=約0.207バーツ 、 1 バーツ (Baht)=約0.030 USD, 1 USD=約33.21 バーツ
( バンコク銀行レート:17 Jul 2026現在 )
• 1 泰铢 ≈ 0.207 元,1 元 ≈ 4.84 泰铢;1 泰铢 ≈ 0.030 美元,1 美元 ≈ 33.21 泰铢(参考盘谷银行 17 Jul 2026 汇率) • 1Baht = About 0.030 USD, 1USD = About 33.21 Baht (Refer to Bangkok Bank currency transfer rate on 17 Jul 2026) • More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
本物件の閲覧数 160 アクセス 本房源已被浏览 160 次 This property already got 160 views มีผู้เข้าชมอสังหาริมทรัพย์นี้แล้ว 160 ครั้ง

Under Construction
Last Update || 13 Nov 2026
 

Comment

4K Drone Gallery

 

Location

Province
Bangkok
City Zoning
Orange (Medium Density Residence)

Common Fee

Factory / Warehouse
The tenant shall be responsible for the elevator inspection and maintenance fee of THB 2,000 per visit, every four months, payable directly to the elevator maintenance technician.
In the event that the elevator requires any repairs, regardless of the cause, the tenant shall be responsible for all repair costs.

Rent Condition

Tax & Fee
Property Tax : Half Pay
Withholding Tax (5% / Month) : Included (Owner Pay)
• In case of rent, tenant have to pay property tax beside the common rental fee.
Minimum Contract Period
3 Year(s)
The rental rate will increase by 10% upon expiration of the lease agreement.
Contract Deposit
4 Month(s)
Advance Payment
1 Month(s)

Sale Condition

Land Attribute

Infrastructure

Floor Loading

Max. Loading : 0.5 Ton(s) / sq.m.
Floor Loading: To Be Confirmed

Clearing Height

Min. Height : 2.9 m., Max. Height : 3.2 m.

Electricity

Only electric system and lighting for basic usage. Don't have electric system, transformer, MDB for industrial usage. Require installation if needed.

Water Supply

Only water supply for basic usage. Don't have water system for factory equipments. Require plumbing work and pump installation if needed.

Interior Decoration

Don't have. (Require construction)

Internet System

Ready Installed (Not require installation)

Air Condition System

Factory : Don't have. (Self install, if need)
Office : Ready Installed (Not require installation)

Facilities

Parking

● Fix 5 car(s) inside land of factory

Property Gallery

 

Map / Master Plan / Others

 
• Not allow to copy and/or use any information, pictures, videos, maps within this website for your business purpose without granted permission from us. Otherwise, we will take legal proceedings.